Plumbline / TN / contractor

Mid-America Pipeline Construction, Inc.

TN license 70786 (1 - HC-1. Structural Steel Erection ; 3 - HC-3. Foundation, Pile Driving, Drilling Stabiliza ; 4 - HC-4. Demolition and Movement of Structures ; 5 - HC-5. Clearing, Grubbing, Snagging and Rip Rap ; 6 - HC-6. Slipform Concrete Structures ; 7 - HC-7. Rigging and Crane Rigging ; 8 - HC-8. Welding ; AGLM - Aggregate Limit $1,500,000.00; F - HC-F. Oil Field Construction) · CATOOSA

The Tennessee Board for Licensing Contractors snapshot dated 2026-07-10 shows license 70786 (1 - HC-1. Structural Steel Erection ; 3 - HC-3. Foundation, Pile Driving, Drilling Stabiliza ; 4 - HC-4. Demolition and Movement of Structures ; 5 - HC-5. Clearing, Grubbing, Snagging and Rip Rap ; 6 - HC-6. Slipform Concrete Structures ; 7 - HC-7. Rigging and Crane Rigging ; 8 - HC-8. Welding ; AGLM - Aggregate Limit $1,500,000.00; F - HC-F. Oil Field Construction) with status "Active", expiring 2027-03-31. The issuing agency's live page is authoritative for today.

What the record shows

Source: Tennessee Board for Licensing Contractors, snapshot 2026-07-10. Raw record hash sha256:b1ebf95c028fec1e2278106dae2f5d454705b62ba38eabe241a626b93b5c1fc8. The issuing agency's live page is authoritative for today: official TN lookup.

What we did not check

Plumbline reports what public records say, with the source for every fact. It is not a rating, a recommendation, or a determination of fitness, and it never takes money from contractors. A "no records found" is never a clean bill of health. How this works and what it does not do.