TN license 72913 (4 - HC-4. Demolition and Movement of Structures ; 5 - HC-5. Clearing, Grubbing, Snagging and Rip Rap ; A - HC-A. Marine, Wharves, Docks, Harbor ; A - MU-A Underground Piping ; AGLM - Aggregate Limit $1,035,000.00; B - HC-B. Tunnel and Shaft ; BC13 - 13. Site and Subdivision Development (BC-13) ; BC24 - 24. Golf Courses (BC-24) ; BC28 - 28. Excavation (BC-28) ; BC31 - 31. Demolition (BC-31) ; BC33 - 33. Irrigation (BC-33) ; C - MU-C Grading and Drainage ; D - HC-D. Dams, Dikes, Levees and Canals ; D - MU-D Base and Paving ; H - HC-H. Storm Damage Cleanup ; HRA - HRA Highway, Railroad, and Airport) · LOUDON
The Tennessee Board for Licensing Contractors snapshot dated 2026-07-10 shows license 72913 (4 - HC-4. Demolition and Movement of Structures ; 5 - HC-5. Clearing, Grubbing, Snagging and Rip Rap ; A - HC-A. Marine, Wharves, Docks, Harbor ; A - MU-A Underground Piping ; AGLM - Aggregate Limit $1,035,000.00; B - HC-B. Tunnel and Shaft ; BC13 - 13. Site and Subdivision Development (BC-13) ; BC24 - 24. Golf Courses (BC-24) ; BC28 - 28. Excavation (BC-28) ; BC31 - 31. Demolition (BC-31) ; BC33 - 33. Irrigation (BC-33) ; C - MU-C Grading and Drainage ; D - HC-D. Dams, Dikes, Levees and Canals ; D - MU-D Base and Paving ; H - HC-H. Storm Damage Cleanup ; HRA - HRA Highway, Railroad, and Airport) with status "Active", expiring 2026-11-30. The issuing agency's live page is authoritative for today.
Source: Tennessee Board for Licensing Contractors, snapshot 2026-07-10. Raw record hash sha256:b1ebf95c028fec1e2278106dae2f5d454705b62ba38eabe241a626b93b5c1fc8. The issuing agency's live page is authoritative for today: official TN lookup.
Plumbline reports what public records say, with the source for every fact. It is not a rating, a recommendation, or a determination of fitness, and it never takes money from contractors. A "no records found" is never a clean bill of health. How this works and what it does not do.