Plumbline / WA / contractor

Printed from Plumbline, a free public-record license check. This page: https://contractors.agentlookups.ai/wa/contractor/CRITIPI843L9-critical-path · Statuses change; check the live page before you rely on this sheet.

CRITICAL PATH INC

WA Contractor registration CRITIPI843L9 (CONSTRUCTION CONTRACTOR) · GIG HARBOR

Phone: 2064553739 · Address: 6119 71st AVE CT NW, GIG HARBOR
Contact details as published in the Washington Department of Labor & Industries (L&I) record we copied on 2026-11-22; confirm with the business before relying on them.

This page shows the record dated 2026-11-22; we rebuild each page at least every 7 days. View the latest record we have.

Record status: active as of 2026-11-22
Source status: "ACTIVE" per Washington Department of Labor & Industries (L&I). The badge summarizes the sourced record below; the record and the issuing agency's live page are what count.

This registration does not establish every trade license or endorsement that a particular job may require. Verify the scope with the issuing agency.

The Washington Department of Labor & Industries (L&I) list dated 2026-11-22 by the agency (we checked it 2026-11-22) shows contractor registration CRITIPI843L9 (CONSTRUCTION CONTRACTOR) with status "ACTIVE", expiring 2028-07-16. The issuing agency's live page is authoritative for today.

What this credential means

This registration does not establish every trade license or endorsement that a particular job may require. Verify the scope with the issuing agency.

Read the recorded status and dates below, then use the issuing agency's verification page to check the current record. Before hiring, confirm the holder, work scope, insurance and permits with the contractor-checking guide.

What the record shows

Status
ACTIVE (in plain terms: active)
Expires
2028-07-16
Issued
2016-06-29

Source: Washington Department of Labor & Industries (L&I), snapshot 2026-11-22. The issuing agency's live page is authoritative for today: official WA lookup.

For developers and AI agents: source snapshot file sha256:51288bd7d56331260d4ec7160d72f4fd0f1126584151f7f74bbfe70cabe0044e (row 36569). This is the archived source file we read this record from, and the row within it; the file hash is shared by every record in the same fetch, so it identifies the snapshot, not the individual record.

Record history

Changes between our snapshots of the official roster, as observed by our archive since 2026-06-11. Earlier changes were not observed. The agency's live record is authoritative for today.

What we did not check

If you have a problem with this licensee, file a complaint with the Washington Department of Labor & Industries (L&I).