Printed from Plumbline, a free public-record license check. This page: https://contractors.agentlookups.ai/wa/contractor/CRITIPM858JF-critical-path-management · Statuses change; check the live page before you rely on this sheet.
WA Contractor registration CRITIPM858JF (CONSTRUCTION CONTRACTOR) · GRAND RAPIDS
Phone: 6163010673 · Address: 934 W FULTON STREET, GRAND RAPIDS
Contact details as published in the Washington Department of Labor & Industries (L&I) record we copied on 2026-11-22; confirm with the business before relying on them.
This page shows the record dated 2026-11-22; we rebuild each page at least every 7 days. View the latest record we have.
This registration does not establish every trade license or endorsement that a particular job may require. Verify the scope with the issuing agency.
The Washington Department of Labor & Industries (L&I) list dated 2026-11-22 by the agency (we checked it 2026-11-22) shows contractor registration CRITIPM858JF (CONSTRUCTION CONTRACTOR) with status "ACTIVE", expiring 2027-06-11. The issuing agency's live page is authoritative for today.
This registration does not establish every trade license or endorsement that a particular job may require. Verify the scope with the issuing agency.
Read the recorded status and dates below, then use the issuing agency's verification page to check the current record. Before hiring, confirm the holder, work scope, insurance and permits with the contractor-checking guide.
Source: Washington Department of Labor & Industries (L&I), snapshot 2026-11-22. The issuing agency's live page is authoritative for today: official WA lookup.
For developers and AI agents: source snapshot file sha256:51288bd7d56331260d4ec7160d72f4fd0f1126584151f7f74bbfe70cabe0044e (row 36570). This is the archived source file we read this record from, and the row within it; the file hash is shared by every record in the same fetch, so it identifies the snapshot, not the individual record.
Changes between our snapshots of the official roster, as observed by our archive since 2026-06-11. Earlier changes were not observed. The agency's live record is authoritative for today.
If you have a problem with this licensee, file a complaint with the Washington Department of Labor & Industries (L&I).